Shunt rolling stock in marshalling yards

Description

Shunt rolling stock to form trains in marshalling yards.

Alternative labels

switch rolling stock
operate shunters to move rolling stock in marshalling yards
conduct shunting activities in marshalling yards
operate shunters to form trains in marshalling yards
use shunters to form trains in marshalling yards
shunt rolling stock
utilise shunters to form trains in marshalling yards
move rolling stock in marshalling yards
switch rolling stock in marshalling yards
perform shunting activities in marshalling yards

Skill type

skill/competence

Skill reusability level

sector-specific

Relationships with occupations

Essential skill

Shunt rolling stock in marshalling yards is an essential skill of the following occupations:

Rail switchperson: Rail switchpersons assist in the tasks of the traffic controller. They operate switches and signals according to rail traffic control instructions, according to regulations and compliant with safety rules.
Shunter: Shunters move shunting units with or without wagons or groups of wagons in order to build trains. They manage the driving of locomotives and are involved in switching wagons, making or splitting up trains in shunting yards or sidings. They operate according to the technical features, such as controlling movement via a remote control device.
Train driver: Train drivers operate trains providing passenger or cargo transport services. They are responsible for driving the locomotive in safe manner, respecting all relevant safety, operational and communication regulations, and have full responsibility for the safety of passengers and cargo. The task involves cooperation and communication with the relevant staff under the infrastructure manager, as well as with staff on board the train.

Optional skill

Shunt rolling stock in marshalling yards is optional for these occupations. This means knowing this skill may be an asset for career advancement if you are in one of these occupations.

 


 

References

  1. Shunt rolling stock in marshalling yards – ESCO

 

Last updated on September 20, 2022