Prepare subgrade for road pavement

Description

Make sure the surface underneath the road is ready to be paved. Ensure that it is flat, stable and able to resist the mechanical stresses of road traffic.

Alternative labels

preparation of road pavement subgrade
road base construction
road pavement subgrade preparation
road base laying
lay road base
laying road base
construction of road base
preparing subgrade for road pavement
subgrade preparation for road surface
construct road base

Skill type

skill/competence

Skill reusability level

sector-specific

Relationships with occupations

Essential skill

Prepare subgrade for road pavement is an essential skill of the following occupations:

Civil engineering worker: Civil engineering workers perform tasks concerning the cleaning and preparation of construction sites for civil engineering projects. This includes the work on building and maintenance of roads, railways and dams.
Road construction worker: Road construction workers perform road construction on earthworks, substructure works and the pavement section of the road. They cover the compacted soil with one or more layers. Road construction workers usually lay a stabilising bed of sand or clay first before adding asphalt or concrete slabs in order to finish a road.

Optional skill

Prepare subgrade for road pavement is optional for these occupations. This means knowing this skill may be an asset for career advancement if you are in one of these occupations.

Road construction supervisor: Road construction supervisors monitor the construction and maintenance of roads. They assign tasks and take quick decisions to resolve problems.

 


 

References

  1. Prepare subgrade for road pavement – ESCO

 

Last updated on September 20, 2022