Test performance of power plants

Description

Analyse the performance of power plants by operating the plant at maximum output for a predetermined period of time so guaranteed performance can be established and legal quality requirements can be verified.

Alternative labels

analyse performance of power plants
testing performance of power plants
power plant performance testing
performance analysing of power plants
analysing performance of power plants
power plant performance analysing
performance testing of power plants

Skill type

skill/competence

Skill reusability level

sector-specific

Relationships with occupations

Essential skill

Test performance of power plants is an essential skill of the following occupations:

Commissioning technician: Commissioning technicians work with commissioning engineers to supervise the final stages of a project when systems are installed and tested. They inspect the correct functioning of the equipment, facilities and plants and when necessary they perform repairs and maintenance.
Commissioning engineer: Commissioning engineers supervise the final stages of a project when systems are installed and tested. They inspect the correct functioning of the equipment, facilities and plants to make sure they meet the requirements and specifications. They perform the necessary verifications and give approval to finalise the project.

Optional skill

Test performance of power plants is optional for these occupations. This means knowing this skill may be an asset for career advancement if you are in one of these occupations.

Test engineer: Test engineers plan and perform detailed quality tests during various phases of the design process to make sure that the systems are properly installed and function correctly. They analyse the data collected during tests and produce reports. They are also responsible for the safety of the test operations.

 


 

References

  1. Test performance of power plants – ESCO

 

Last updated on September 20, 2022